6 hours ago, Ale188 said:

UPDATE ON THE R211S AS OF 2/28/24

R211s in service

R211A: 250 cars, or 25 10-car trains

4060-4304, 4310-14

R211T: 20 cars, or 2 10-car trains, all trains currently run on the line

4040-59

Total amount of R211s in service: 270

All at pitkin

Other consists not in service yet and TBD sets

R211A:

4305-09 (4309 v1 had frame damage, 4309 v2 just delivered)

4319-34 (never coupled with each other)

R211S:

100-104 (delayed in-service date somewhat)

Total amount of NIS R211s: 25

R211 Deliveries

R211A: 4060-4334, 275 cars or 27 10-car sets or 1 5-car set

R211T: 4040-4059, 20 cars or 2 10-car sets

R211S: 100-104, 5 cars or 1 5-car set

Total number of cars delivered: 300

R211s confirmed as built

R211A: 4335-4449, 115 cars or 12 10-car trains

R211S: 105-174, 70 cars or 14 5-car trains

Total cars built and not delivered: 190 

Here are the results...

390 R211As (4060-4449)

20 R211Ts (4040-4059)

75 R211Ss (100-174)

485 R211s in total, (100-174, 4040-4449)

NOTE: I will keep the in-service and delivery timelines to myself, not trying to waste space.

Thanks for reading, we reached 300 cars!

You mean 4315-4334

Link to comment
Share on other sites


  • Replies 8.7k
  • Created
  • Last Reply

Top Posters In This Topic

Top Posters In This Topic

On 8/22/2024 at 1:50 PM, Ale188 said:

UPDATE ON THE R211S AS OF 2/28/24

R211s in service

R211A: 250 cars, or 25 10-car trains

4060-4304, 4310-14

R211T: 20 cars, or 2 10-car trains, all trains currently run on the line

4040-59

Total amount of R211s in service: 270

All at pitkin

Other consists not in service yet and TBD sets

R211A:

4305-09 (4309 v1 had frame damage, 4309 v2 just delivered)

4319-34 (never coupled with each other)

R211S:

100-104 (delayed in-service date somewhat)

Total amount of NIS R211s: 25

R211 Deliveries

R211A: 4060-4334, 275 cars or 27 10-car sets or 1 5-car set

R211T: 4040-4059, 20 cars or 2 10-car sets

R211S: 100-104, 5 cars or 1 5-car set

Total number of cars delivered: 300

R211s confirmed as built

R211A: 4335-4449, 115 cars or 12 10-car trains

R211S: 105-174, 70 cars or 14 5-car trains

Total cars built and not delivered: 190 

Here are the results...

390 R211As (4060-4449)

20 R211Ts (4040-4059)

75 R211Ss (100-174)

485 R211s in total, (100-174, 4040-4449)

NOTE: I will keep the in-service and delivery timelines to myself, not trying to waste space.

Thanks for reading, we reached 300 cars!

btw, option car shells are being built, we dont know car numbers though

Link to comment
Share on other sites

9 minutes ago, nikitos6712 said:

btw, option car shells are being built, we dont know car numbers though

Yeah, but he's not counting the shells thou, not that it matters....

Edited by Metro CSW
Link to comment
Share on other sites

1 hour ago, Lawrence St said:

What on earth is happening with the units on Staten Island? Yonkers is about to burst with all these R211S production sets with no word on what's going on. 

I guess there are still issues going on with the pilot r211S. Plus, the train crew in SIR have to be trained since this will be their first time operating NTTs.

I wouldn't be surprised if the MTA is more focused on the r211As than the r211Ss.

Link to comment
Share on other sites

North 4319-4315 + 4324-4320 South 

Just seen burn-in testing with NO Signs in the windows at Jay Street MetroTech at 9:45PM, Northbound side signed as (A) to 207th 

 

Edited by 4P3607
Link to comment
Share on other sites

The R-211S (SIR) Pilot Set is currently at St. George on the far right platform. Lots of testing equipment on the inside in the first car (104 facing North). Computers, many wires, a stand-up fan and a jobmaster chest (construction box). 

 

Link to comment
Share on other sites

4 minutes ago, 4P3607 said:

The R-211S (SIR) Pilot Set is currently at St. George on the far right platform. Lots of testing equipment on the inside in the first car (104 facing North). Computers, many wires, a stand-up fan and a jobmaster chest (construction box). 

 

The pilot R211S has to go through a process similar to what the pilot R211A and R211T went through. I see the R211S entering service sometime in October or November.

Link to comment
Share on other sites

2 hours ago, Ale188 said:

Surprised they delivered it before the pilot went into service

This has happened before, notably with Miami's Metrorail where the second new Hitachi trainset delivered became the first to debut in service and the pilot set had so many issues it eventually entered service years later as the last trainset to debut after the remainder of the order was delivered and in service.

Curious to know if the cab signaling issues with the R-211S are similar to Miami's troubles with their Hitachis where track circuit signaling conflicts with the train's computer program, notably also putting the train into Emergency at different spots along the line (Brakes dump, all signs lose station location and just display "Metrorail") and especially having to dump and reset multiple times when single tracking, placing the train in different modes just to proceed. The original Budd cars were directly compatible with the track circuit signaling without any issues while the new Hitachis STILL to this day experience signal trouble and compatibility problems along the line despite all new cars now in service, still going into BIE at different locations. 

I'm not a technician nor know much about cab signaling but the above is what I have observed in Miami when it comes to placing new trains into service on a line where the signal system and new trainsets have compatibility issues taking an extensive time to resolve and curious if the R-211S is experiencing similar trouble. 

Link to comment
Share on other sites

20 minutes ago, Lawrence St said:

Can someone explain what’s happening with R211 4309? I’m hearing wild stories from it falling off the trailer to striking the top of a bridge…so which is it?

Looking at the video linked below, you can clearly see a dent as well as other damage to the roof around the 1:07 mark, so this was likely the original 4309. If I had to guess what happened, something probably hit it.

But this all has me wondering, why on earth are they going through the hassle of replacing the ENTIRE car just because of some seemingly minor damage? I don’t see how something like that could negatively impact the structural integrity of the car.

 

Edited by TrainGamingKing9928
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.