Cyberider Posted September 14, 2023 Share #6226 Posted September 14, 2023 Some R-211 action plus a ride from Howard Beach to the Rockaways in the first 30 minutes of this video from the Retired Railroad Horn Guy taken 9-13-23. https://www.youtube.com/watch?v=cRaNMEH1JTs 0 Quote Link to comment Share on other sites More sharing options...
Ale188 Posted September 14, 2023 Share #6227 Posted September 14, 2023 So, we have 110 R211s delivered to NYC so far, but I'm assuming 4145-49 will get delivered next week. And MAYBE, MAYBE a T will hit service next week cuz it's usually 1 R211A train every 2 weeks. It has been back to back, last week being 4090-94/4125-29, and today being 4110-4119. And that's probably why the MTA did so. But it's whatever. My damn diagram, but actually correct. R211A: 4060-4144, 85 cars, or 8 10-car trains and 1 5-car train R211T: 404-4059, 20 cars, or 2 10-car trains R211S: 100-104, 5 cars, or 1 5-car train Total: 85 + 20 + 5 = 110 total R211 cars R211s in service: 4060-4099, 4110-4129 (all As), 60 cars, or 6 10-car trains Lines R211s run on: Lines R211s will soon run on: ( is still possible if the Softee transfers back to 🇯🇲) 0 Quote Link to comment Share on other sites More sharing options...
Comrade96 Posted September 15, 2023 Share #6228 Posted September 15, 2023 5 hours ago, Ale188 said: So, we have 110 R211s delivered to NYC so far, but I'm assuming 4145-49 will get delivered next week. And MAYBE, MAYBE a T will hit service next week cuz it's usually 1 R211A train every 2 weeks. It has been back to back, last week being 4090-94/4125-29, and today being 4110-4119. And that's probably why the MTA did so. But it's whatever. My damn diagram, but actually correct. R211A: 4060-4144, 85 cars, or 8 10-car trains and 1 5-car train R211T: 404-4059, 20 cars, or 2 10-car trains R211S: 100-104, 5 cars, or 1 5-car train Total: 85 + 20 + 5 = 110 total R211 cars R211s in service: 4060-4099, 4110-4129 (all As), 60 cars, or 6 10-car trains Lines R211s run on: Lines R211s will soon run on: ( is still possible if the Softee transfers back to 🇯🇲) the B D F part isnt confirmed as of yet 1 Quote Link to comment Share on other sites More sharing options...
FLX9304 Posted September 15, 2023 Share #6229 Posted September 15, 2023 5 hours ago, Ale188 said: So, we have 110 R211s delivered to NYC so far, but I'm assuming 4145-49 will get delivered next week. And MAYBE, MAYBE a T will hit service next week cuz it's usually 1 R211A train every 2 weeks. It has been back to back, last week being 4090-94/4125-29, and today being 4110-4119. And that's probably why the MTA did so. But it's whatever. My damn diagram, but actually correct. R211A: 4060-4144, 85 cars, or 8 10-car trains and 1 5-car train R211T: 404-4059, 20 cars, or 2 10-car trains R211S: 100-104, 5 cars, or 1 5-car train Total: 85 + 20 + 5 = 110 total R211 cars R211s in service: 4060-4099, 4110-4129 (all As), 60 cars, or 6 10-car trains Lines R211s run on: Lines R211s will soon run on: ( is still possible if the Softee transfers back to 🇯🇲) You gotta take it one line at a time. You can’t assume until ALL BASE order is done as for the R211Ts, nobody knows for sure once the R211Ts start late this year 0 Quote Link to comment Share on other sites More sharing options...
Kamen Rider Posted September 15, 2023 Share #6230 Posted September 15, 2023 Literally the only confirmed detail is the R211T and R211S will commence passenger testing within the next year. past that, it is all up in the air. 6 Quote Link to comment Share on other sites More sharing options...
subwaycommuter1983 Posted September 15, 2023 Share #6231 Posted September 15, 2023 11 hours ago, Comrade96 said: the B D F part isnt confirmed as of yet True If the B D don't get the r211's, then the B D will get r160's. Regardless of the outcome, the r68's cannot stay on the B D due to CBTC on 8th Avenue and 6th Avenue. 0 Quote Link to comment Share on other sites More sharing options...
FLX9304 Posted September 15, 2023 Share #6232 Posted September 15, 2023 38 minutes ago, subwaycommuter1983 said: True If the B D don't get the r211's, then the B D will get r160's. Regardless of the outcome, the r68's cannot stay on the B D due to CBTC on 8th Avenue and 6th Avenue. You too 0 Quote Link to comment Share on other sites More sharing options...
zacster Posted September 15, 2023 Share #6233 Posted September 15, 2023 37 minutes ago, subwaycommuter1983 said: True If the B D don't get the r211's, then the B D will get r160's. Regardless of the outcome, the r68's cannot stay on the B D due to CBTC on 8th Avenue and 6th Avenue. But how soon will CBTC be on 8th Ave, never mind 6th Ave. It'll be a while. In the meantime, exhale. 0 Quote Link to comment Share on other sites More sharing options...
Ale188 Posted September 15, 2023 Share #6234 Posted September 15, 2023 9 minutes ago, zacster said: But how soon will CBTC be on 8th Ave, never mind 6th Ave. It'll be a while. In the meantime, exhale. It will take a while, though 0 Quote Link to comment Share on other sites More sharing options...
4P3607 Posted September 15, 2023 Share #6235 Posted September 15, 2023 4105-4109 + 4100-4104 were burn-in testing earlier. 5 Quote Link to comment Share on other sites More sharing options...
JayJay85 Posted September 15, 2023 Share #6236 Posted September 15, 2023 7 hours ago, FLX9304 said: You too The R68A's will be stuck on for while until about end of 2027, the way how R211's deliveries are coming along, The should be 100% R179 and R211's by end of 2025 based on deliveries rates 20 cars per month, so basically we won't likely start seeing R211A's on other lines until beginning of 2026 or end 2025. 0 Quote Link to comment Share on other sites More sharing options...
FLX9304 Posted September 15, 2023 Share #6237 Posted September 15, 2023 39 minutes ago, JayJay85 said: The R68A's will be stuck on for while until about end of 2027, the way how R211's deliveries are coming along, The should be 100% R179 and R211's by end of 2025 based on deliveries rates 20 cars per month, so basically we won't likely start seeing R211A's on other lines until beginning of 2026 or end 2025. Very, very well. Right now, the R211A delivery is up to 4140-4144, with 6 sets in service. the 6 sets are in order: 4060-4064+4065-4069 4070-4074+4075-4079 4085-4089+4095-4099 4080-4084+4120-4124 4090-4094+4125-4129 4110-4114+4115-4119 —————————————- the th set: 4100-4104+4105-4109 is in burn in test. R211T: 4040-4059 are in the system and ready for passenger testing in 2024 R211S: 100-104 are in the system and it will be shipped to Staten Island and operate on their tracks after going thru testing R211A: 4130-4144 so far are in the system and will go thru burn in. R211A: 4145-4499 will be delivered 5 cars at a time with timing from both , & Kawasaki. 0 Quote Link to comment Share on other sites More sharing options...
Ale188 Posted September 16, 2023 Share #6238 Posted September 16, 2023 1 hour ago, FLX9304 said: Very, very well. Right now, the R211A delivery is up to 4140-4144, with 6 sets in service. the 6 sets are in order: 4060-4064+4065-4069 4070-4074+4075-4079 4085-4089+4095-4099 4080-4084+4120-4124 4090-4094+4125-4129 4110-4114+4115-4119 —————————————- the th set: 4100-4104+4105-4109 is in burn in test. R211T: 4040-4059 are in the system and ready for passenger testing in 2024 R211S: 100-104 are in the system and it will be shipped to Staten Island and operate on their tracks after going thru testing R211A: 4130-4144 so far are in the system and will go thru burn in. R211A: 4145-4499 will be delivered 5 cars at a time with timing from both , & Kawasaki. But aren't the Ts supposed to hit service later this year? 0 Quote Link to comment Share on other sites More sharing options...
subwaycommuter1983 Posted September 16, 2023 Share #6239 Posted September 16, 2023 3 hours ago, JayJay85 said: The R68A's will be stuck on for while until about end of 2027, the way how R211's deliveries are coming along, The should be 100% R179 and R211's by end of 2025 based on deliveries rates 20 cars per month, so basically we won't likely start seeing R211A's on other lines until beginning of 2026 or end 2025. Kawasaki will need to speed things up with the r211's or the MTA will have to delay the completion of 8th Avenue CBTC. 0 Quote Link to comment Share on other sites More sharing options...
R32 3838 Posted September 16, 2023 Share #6240 Posted September 16, 2023 (edited) 27 minutes ago, subwaycommuter1983 said: Kawasaki will need to speed things up with the r211's or the MTA will have to delay the completion of 8th Avenue CBTC. 8th ave CBTC is already delayed, They want it done by 2025 but it'll be done by 2026. The and can't be 100% tech by then because the Base order would be complete by then going into option I. This all takes time, The main goal is to make the and 100% tech or 100% R211's by 2025-26. All of the 10 car R179s are rumored to be pushed out to Jamaica to expand their CBTC fleet and the 8 car ones would probably end up at ENY. The and can still get re-routed on 8th ave even with CBTC with R68s as long as the wayside signals aren't as far apart (for that time being) until the / becomes 100% tech. Edited September 16, 2023 by R32 3838 0 Quote Link to comment Share on other sites More sharing options...
subwaycommuter1983 Posted September 16, 2023 Share #6241 Posted September 16, 2023 24 minutes ago, R32 3838 said: 8th ave CBTC is already delayed, They want it done by 2025 but it'll be done by 2026. The and can't be 100% tech by then because the Base order would be complete by then going into option I. This all takes time, The main goal is to make the and 100% tech or 100% R211's by 2025-26. All of the 10 car R179s are rumored to be pushed out to Jamaica to expand their CBTC fleet and the 8 car ones would probably end up at ENY. The and can still get re-routed on 8th ave even with CBTC with R68s as long as the wayside signals aren't as far apart (for that time being) until the / becomes 100% tech. Thanks for the clarification. I just hope that option order 2 is exercised and I just hope that the MTA doesn't screw things up in regards to the number of r262's and r268's that need to be purchased. 0 Quote Link to comment Share on other sites More sharing options...
darkstar8983 Posted September 16, 2023 Share #6242 Posted September 16, 2023 (edited) 2 hours ago, subwaycommuter1983 said: Thanks for the clarification. I just hope that option order 2 is exercised and I just hope that the MTA doesn't screw things up in regards to the number of r262's and r268's that need to be purchased. The MTA better not get to scrap happy and remove wayside signals too soon. And the R262 / R268s are the MTAs last chance to get subway car orders right in terms of retiring non NTT equipment so that CBTC systemwide rollouts can start. The entire R211 order is needed because it will be the last order prior to phase 2 of SAS opening, and every last car will be needed to provide full Service on SAS and prepare the Broadway Line for whatever changes need to be done to the mainline Edited September 16, 2023 by darkstar8983 1 Quote Link to comment Share on other sites More sharing options...
FLX9304 Posted September 17, 2023 Share #6243 Posted September 17, 2023 With all this GO going on today, there was only a train of set of R211: 4090-4094 + 4125-4129 in service on the and a set of R160s 8401-8404 + 8489-8492 on the between both 207th & 168th Sts respectively to Euclid Ave. I didn’t check the Rockaway section today. 0 Quote Link to comment Share on other sites More sharing options...
Ale188 Posted September 17, 2023 Share #6244 Posted September 17, 2023 4090-94/4125-29 had a codebreaker, signing up as a . It was obviously on the A, but it was a mistake. 0 Quote Link to comment Share on other sites More sharing options...
JustTheSIR Posted September 17, 2023 Share #6245 Posted September 17, 2023 On 9/16/2023 at 1:45 AM, darkstar8983 said: The MTA better not get to scrap happy and remove wayside signals too soon. And the R262 / R268s are the MTAs last chance to get subway car orders right in terms of retiring non NTT equipment so that CBTC systemwide rollouts can start. The entire R211 order is needed because it will be the last order prior to phase 2 of SAS opening, and every last car will be needed to provide full Service on SAS and prepare the Broadway Line for whatever changes need to be done to the mainline You know, I keep on hearing stuff about the 8 car sets being sent to ENY but does ENY even need, or can even hold that many 8 car sets? Why not throw some onto the Q for Phase 2, or something feel free to roast me 0 Quote Link to comment Share on other sites More sharing options...
Comrade96 Posted September 17, 2023 Share #6246 Posted September 17, 2023 7 minutes ago, JustTheSIR said: You know, I keep on hearing stuff about the 8 car sets being sent to ENY but does ENY even need, or can even hold that many 8 car sets? Why not throw some onto the Q for Phase 2, or something feel free to roast me 480 foot trains wont work on the Q, plus itd be an oddball fleet 0 Quote Link to comment Share on other sites More sharing options...
MJHmarc Posted September 17, 2023 Share #6247 Posted September 17, 2023 20 minutes ago, JustTheSIR said: You know, I keep on hearing stuff about the 8 car sets being sent to ENY but does ENY even need, or can even hold that many 8 car sets? Why not throw some onto the Q for Phase 2, or something feel free to roast me There’s word(unconfirmed for now) of R46’s being taken OOS for parts already as more R211’s come into service. 0 Quote Link to comment Share on other sites More sharing options...
Ale188 Posted September 17, 2023 Share #6248 Posted September 17, 2023 (edited) 19 minutes ago, MJHmarc said: There’s word(unconfirmed for now) of R46’s being taken OOS for parts already as more R211’s come into service. Already? @R32 3838 said that 80 cars would have to be in service for R46s to start going OOS and stripped. There's only 60 rn. Edited September 17, 2023 by Ale188 0 Quote Link to comment Share on other sites More sharing options...
Cait Sith Posted September 17, 2023 Share #6249 Posted September 17, 2023 34 minutes ago, MJHmarc said: There’s word(unconfirmed for now) of R46’s being taken OOS for parts already as more R211’s come into service. The A-A pairs were said to be going first. 2 Quote Link to comment Share on other sites More sharing options...
MJHmarc Posted September 17, 2023 Share #6250 Posted September 17, 2023 16 minutes ago, Ale188 said: Already? @R32 3838 said that 80 cars would have to be in service for R46s to start going OOS and stripped. There's only 60 rn. Very possible that these were cars already OOS before the “window breaks” last week and now that the MTA are out of that glass for that model the ones OOS could stay that way. 0 Quote Link to comment Share on other sites More sharing options...